top of page
5339 Shop pic.png
BidaraSuria_Logo_Color.png

DOUBLE STOREY BUSINESS UNITS

Floor Plan
a.jpg
Site Plan
SH_GadongShoplot_Brochure_SiteMap v3.png
Location
SH_GadongShoplot_Brochure_Map-1.png

Specification

ELECTRICAL INSTALLATION
Lighting Point                 • 18 nos.

Power Point                    • 8 nos.
Ceiling Fan Point            • 4 nos.
 
SANITARY INSTALLATION
Wash Basin                   • 2 nos.
Siting WC                      • 2 nos.
Kitchen Sink                  • 2 nos.
 
FLOOR FINISHES
Bathroom & Refuse :    • Ceramic Tiles
Others                           • Cement Render
Dapur & bilik mandi      • Jubin seramik
Anjung kereta               • Konkrit
Lain-lain                       • Lepaan simen

WALL FINISHES
Toilet / Pantry / Rubbish Compartment
 
• 5 ft Height Wall Tile
Others                                 
 
• Cement Plaster Emulsion Paint
STRUCTURE
Reinforced Concrete Structure
 
WALL
Cement and Sand Bricks wall

ROOF
Metal Deck Roofing

CEILING
Concrete Slab / Skim Coat / Plaster Board

WINDOW
Aluminium Frame Fixed Glass Panel / Top Hung Window

DOORS

Roller Shutter / Plywood Flush Door /
Aluminium Louvres Door / Fire Rated Door




 
© 2025 by Summer Harvest Sdn. Bhd. 199301019624 (274362-P).
  • Facebook
bottom of page